Air Pollution Controls - General Shale Brick Moncure (1900009)

Last Update: 05/22/06 ----- 04384T24/RRO ----- EPA | DAQ | EPA-TTN
Air Pollution Controls
MACT - 40 CFR Part 63 Subpart JJJJJ

Kiln K3K - Dry Limestone Adsorber (DLA) installed on one natural gas/propane-fired Brick Tunnel Kiln (25.9 mmBtu/hr, 20.55 tons per hour maximum production rate)

Kiln K4K - Dry Limestone Adsorber (DLA) installed on one natural gas/propane-fired Brick Tunnel Kiln (25.9 mmBtu/hr, 20.55 tons per hour maximum production rate)

Kilns Not Subject to MACT

Permit is Silent??? Kilns K1 and K2 - Two wood/natural gas-fired brick tunnel kilns (20.3 mmBtu/hr, 13.7 tons per hour maximum production rate each)

Six natural gas/propane-fired brick dryers (4.43 mmBtu/hr each)