| Home | NC Title V | NC MACT | Coal-Fired EGUs | People | Technical | Links |
|---|
| Mohawk Industries Home | Emissions | Controls | Map/Photos | IBEAM |
|---|
Ten heat-set machines (410 lbs/hr maximum design capacity each, ID Nos. ES1-ES10)
Two NG/No.2/No.6 fuel oil-fired boilers (21 mmBtu/hr each, ID Nos. ES11-ES12)