| Source ID |
Source Description |
Control ID |
Control Description |
| ES-B1 |
one wood-fired boiler with preheater (44.5 mmBtu/hr) |
CD-B-MC1 and CD-B-MC2 |
two multicyclones (25 eight-inch tubes and 64 six-inch tubes, respectively) installed in series |
| ES-Boiler2 |
one wood-fired underfeed stoker boiler (28.69 mmBtu/hr) with flyash reinjection |
CD-B2-1 & B2-2 |
two multicyclones (18 nine-inch tubes each) installed in series |
| ES-WCS |
one sawmill woodwaste collection system discharging into the wood fuel silo |
CD-C2 |
one simple cyclone (41 inches in diameter) |
| ES-PM |
One planer mill woodwaste collection system |
CD-C3 |
one simple cyclone (156 inches in diameter) |
| ES-SH |
One trim saw and wood hog woodwaste collection system |
CD-C4 |
one simple cyclone (108 inches in diameter) |
| ES-KILN-1 and ES-KILN-2 |
Two steam heated lumber drying kilns (120,000 board-feet of lumber charge capacity each) |
NA |
NA |