Last Update: 08/28/06 ----- 08179T06/FRO ----- EPA | DAQ | EPA-TTN
Air Pollution Controls
MACT - 40 CFR Part 63 Subpart JJJJJ

Kiln K1 - Dry Limestone Adsorber (DLA), ID No. CD-K1, installed on one natural gas/ No. 2 fuel oil/ No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per hour material output rate, 42.8 million Btu per hour heat input rate)

Kiln K2 - Dry Limestone Adsorber (DLA), ID No. CD-K2, installed on one natural gas/ No. 2 fuel oil/ No. 6 fuel oil-fired Brick Tunnel Kiln (29.0 tons per hour material output rate, 42.8 million Btu per hour heat input rate)


About Us | Site Map | Login