Last Update: 08/28/06 ----- 08179T06/FRO ----- EPA | DAQ | EPA-TTN
Hazardous Air Pollutants (Title III and MACT)
- Emission Sources: Two brick tunnel kilns (one new kiln and one existing kiln, each 29 tph) firing NG/No. 2 oil/No. 6 oil.
- Applic MACT: Brick Mfg (JJJJJ) ed=05/16/03, cd=05/16/06, at startup for new kiln.
- Key Pollutants: hydrogen fluoride, hydrogen chloride, PM (surrogate for toxic metals).
- Compl. Strategy: Dry Limestone Adsorbers (DLAs) to meet HF/HCl/PM limits OR meet required control efficiencies.
- Permit Stip.: Permit T06 includes MACT language.
- Other Facilities for MACT: Triangle Brick Merry Oaks (1900077)
- NC Toxics: Permit includes 2D .1100 limits for HCl, HF, and toxic metals.
- Last Action for MACT: Stack test conducted on kiln 1 (old unit) and report submitted to DAQ.
- Next Action for MACT: DAQ review of stack test report.
Criteria Pollutants and Hazardous Air Pollutants (Title V)
- Facility Emissions: 2003, 2004.
- Emission Sources: Two brick tunnel kilns (each 29 tph) firing NG/No. 2 oil/No. 6 oil.
- Major Pollutants for Title V: CO, SO2, HF, HCl
- Last Action for Title V: Semiannual report received by 07/30/06.
- Next Action for Title V: Next semiannual report due by 01/30/07.
Chemical Accident Prevention and Response (EPA 112(r) Program)
- No listed chemical above the 112(r) threshold.